• 0308-8268888
  • gizaenterprises1@gmail.com
  • ISLAMABAD · PAKISTAN
Giza Enterprises (Pvt) Ltd Logo
  • Home
  • About Us
  • Services
  • Projects
  • Infrastructure
  • Gallery
  • Home
  • About Us
  • Services
  • Projects
  • Infrastructure
  • Gallery
Contact Us

Author: saadicarnot.pk@gmail.com

CDA’s 2026 setback rules — what they change for Blue Area builds.

photo 1487958449943 2429e8be8625

The revised setback requirements published in March materially affect FAR calculations for commercial plots. Full breakdown with worked example.

Turnkey vs gray-structure: which contract to actually sign.

photo 1486406146926 c627a92ad1ab

Most first-time developers ask for turnkey by default. That’s often wrong. Here’s how to decide based on your interior scope.

The real cost of Pakistan’s road-per-km numbers

photo 1541888946425 d81bb19240f5

Public tender figures for highway construction have been rising 12–14% annually. Here’s how much of that is asphalt and how much is exchange rate.

Giza Enterprises (Pvt) Ltd Logo

Engineering & construction for Pakistan’s residential, commercial, and infrastructure projects.

Quick Links

About Us

Projects

Blogs

Contact Us

Services

Residential

Commercial

High-Rise

Infrastructure

Reach us

0308-8268888

gizaenterprises1@gmail.com

Office #12, Blue Area Islamabad, Pakistan

Facebook-f X-twitter Instagram
  • SECP 2020
  • PEC C-5
  • NLC Enlisted
  • MES (PAF)
  • DHA C-5
  • FBR ATL
  • ICCI Member

© 2026 Giza Enterprises (Pvt) Ltd. All rights reserved. Design and develop by Digitalis Global

PEC Registered · ISO 9001:2015